Norwood Middle School Renovation

Norwood Middle School Renovation

  • MEP, roof, and architectural upgrades of the building, which was originally built in 1914.
  • With school still being in session during construction throughout the 2018-2019 school year, phasing and working closely with the school district and staff play a major role in the success of this project.
  • Air conditioning and climate control are being added throughout the building, while maintaining the ornate and decorative original plaster work still located inside the entryways and auditorium of the building.
  • New LED lights, fresh paint, and acoustical ceilings that still allow light to travel through all the windows, are giving the classrooms a newer and brighter look.
  • The addition of an easily accessible, full size elevator, to the school will be a great new addition for the students, faculty, and visiting public.
  • Upgrade to the life safety services include all new fire alarm systems and emergency lighting throughout the building.

Project Description

Client: Norwood City School District
Location: 2060 Sherman Avenue, Cincinnati, Ohio 45212
Value: $7,700,000
Architect: SHP Leading Design